Strategy
Quality Tiers and the R&D Ladder
Patent cost scales as 2.4^q and output quality is capped by input quality. Why high quality requires a supply chain, not a cheque.
Every product has a quality tier from Q0 to Q10. Each tier adds 8% to the retail price. Reaching a tier requires a patent, and patents get expensive fast.
PatentCost(q) = C_base(sku) x 2.4^q
q_out = min(q_patent, floor(mean(q_inputs)) + 1)
Two formulas, and the second one is the interesting half.
The cost curve
2.4^q compounds brutally. Relative to a Q1 patent:
| Tier | Relative cost | Retail premium |
|---|---|---|
| Q1 | 1x | +8% |
| Q2 | 2.4x | +16% |
| Q3 | 5.8x | +24% |
| Q5 | 33x | +40% |
| Q7 | 191x | +56% |
| Q8 | 459x | +64% |
| Q10 | 2,642x | +80% |
Q0 to Q3 is accessible within days of starting. Q7 to Q10 demands exponential cash and material investment for a linear price gain. That asymmetry is the whole design: the ladder is steep enough that nobody climbs all of it, in everything.
Patent burns are a permanent currency sink, budgeted alongside loan interest and lease taxes at roughly 20—30% of total cash drain.
The input cap is the real constraint
q_out = min(q_patent, floor(mean(q_inputs)) + 1)
You can only ever produce one tier above the average quality of what you put in. A Q10 patent on a laptop plant fed Q2 microchips produces Q3 laptops. The patent money is wasted.
This single clause does more for the economy than any other quality rule, because it means high quality cannot be bought with cash alone — it requires a supply chain.
Working a laptop backwards: a Q8 laptop needs inputs averaging Q7. That means Q7 microchips, which need Q6 wafers and Q6 copper wire, which need Q5 silicon sand and Q5 copper ore. Five tiers deep, across four industries, probably three continents. No single company can hold all those patents and all those plots — the plot cap forbids it.
So a premium electronics manufacturer must buy high-quality intermediates from specialists who chose to climb one rung of one ladder very far. That market exists because of this formula.
Where quality pays best
Quality multiplies with scarcity in the retail price curve:
P = P_base x clamp((D_target / S_15m)^0.35, 0.55, 1.65) x M_macro x (1 + 0.08q)
The quality term and the elasticity term are independent multipliers. A Q5 good delivered into an undersupplied city earns 1.40 x 1.65 = 2.31x reference before macro effects. That is the highest margin position available in the game.
It also means quality is worth most where supply is thin — which is usually the newer, less contested cities rather than the mega-hubs everyone crowds into.
The streak interaction
UnitsPerHour = BaseRate x Level x (1 + Biome + Guild + Streak)
The streak bonus is min(0.15, 0.03 x consecutive run days) and resets to zero whenever a building switches recipe.
A plant that has run the same product for five days carries +15% output. Switching it to chase a price spike throws that away and takes five days to rebuild. Combined with the cost of a quality ladder you have already climbed on that recipe, specialised plants want to stay specialised.
This is a quiet but strong force toward stable production, and it is why the market has reliable suppliers at all.
A practical ladder
Q0 to Q2: do it immediately on your retail SKU. Cheap, and +16% on every retail sale compounds from day one.
Q3: the natural stopping point for a generalist. +24% for 5.8x the Q1 patent cost is still comfortably worth it. Most profitable mid-size companies sit here across their whole line.
Q5 to Q6: only on one product. 33x to 79x the base cost. Worth it if that product is your specialisation and you can secure Q4—Q5 inputs reliably — which means contracts, not spot.
Q7+: a late-game, multi-company project. 191x and up. This is where the premium intermediates market lives, and it is as much a supply-chain negotiation as an investment.
The failure mode
Buying a high patent before securing the inputs. The patent is a permanent burn; the inputs are a weekly negotiation. Secure the supply chain at the quality you need, with contracts at a 1.5% fee, then buy the patent that lets you use it.
The reverse order is the most expensive mistake in the mid-game, and it is a very tempting one, because the patent is a single button and the supply chain is a week of conversations.